Construction of a large underground shop.  Scope included the haulage, placement and polishing of 1000 cu-m of concrete for the floor slab. Two, 25 tonne overhead cranes were installed along with four monorails and two truck lifts.  The scope also included for the construction of a refuge station, office, warehouse, wash bay, lube bay, drainage system and sump.  Four large ventilation walls complete with overhead doors were installed.  Technica supplied all labour and equipment required for the completion of the work.  An extensive quality control/quality assurance program was integral in the completion of a world class underground maintenance facility.  Please see the video below of the finished product.

Services provided