Onaping Depth Project

This contract includes extending the lateral development from 1915L to the 1985L Exploration Ramp and Diamond Drill platforms. Additionally, completion of the 1915L development is to be included along with all power and services distribution required. Also included in this scope is to provide mucking services to the vertical development that will be on-going, with muck reporting to both 1440L and 1915L as this contract progresses. Technica procured technically advanced gear for this project including an M2C and Boltec from Epiroc.