The infrastructure we build on a daily basis includes refuge stations, pump stations, and more.
We offer lateral development services, including ramp, level and large excavations
Our experience includes narrow vein gold mining to long hole open stoping at metal mines.
We offer a full suite of electrical installation and maintenance services.
We operate shafts for our clients; providing full supervision and more.
We offer a full suite of above ground site excavation and blasting services.
We specialize in mining engineering and perform mine design, due diligence, constructability and peer reviews.
We own a large fleet of more than 250 pieces of equipment, maintained at Technica in Lively, Ontario.
We can offer unique financing alternatives to bring quality deposits into production.
Raise boring presents significant advantages over conventional raises, maximizing efficiency and safety while minimizing downtime.
We have extensive experience in Mine Maintenance Shutdowns. With proper planning we can safely refurbish mine infrastructure on a tight schedule.
The Pump Station Inlet project completed by Technica was a design build mining/construction project. The project required Technica to develop and construct a vertical shaft/pump well with an underground horizontal connection to an existing open pit reservoir.
The purpose of the project was to create an inlet for a future pump station that will collect all seepage water from the nearby smelter waste dump site so that the water can be collected and pumped for treatment prior to release to the environment. The project required Technica to install ground support on an existing 60ft high pit wall, develop a portal and 120ft of horizontal drift, drill/blast/bolt a 80ft deep 15ft diameter vertical shaft, construct a shaft collar/pump foundation, install and concrete in place a special order polymer coated pump well/tunnel liner in the shaft and drift, and install an inlet screen in the bottom of the reservoir. All aspects of the design, development, and construction were managed by Technica with Technica workforce completing over 95% of the work directly. The project was completed injury free over a 7 month period.